Click on picture to
view a larger image.

As I have posted on the blog, I have been doing bits and pieces. This posts catches up to today’s work.

Before Oshkosh I was working on the control arm shown below. These pictures show the arm after I finished shaping it, to up through the installation. It was not difficult to make but it was a little tricky to install. I had to disassemble some pieces to install it. The vertical lever is the elevator trim and the arm itself has the stops for the positions of the flap lever.