Click on thumbnail
to view a larger image.

It’s been an exciting week – time for the big finish.

Before starting the rivets, I adjusted the aileron push rod where it attaches to the aileron.  It was biased to the up side quite a bit.  I coarsely set the neutral angle and adjusted to be able to get full down and up motion.

This was just a rough adjustment to get it close. It will be redone.

      These two pictures show the start of riveting. The rear spar is about half way done.  The second picture shows the root doubler at the wing walk area.  As I said previously, this gets riveted much later.