Click on a picture to
view a larger image.

After the wheels were chocked we drilled holes below the axles and right by the steel cross members of the trailer.  Ken and Dave are hard at work on rigging the straps in pictures one and two. We attached ratchet straps around each axle and secured them around the steel cross members.  In picture three I’m doing a final inspection while Jeff secures the loose end of the ratchet material.

982SX is ready for airflow.