Click on picture to
|
Then it’s time to do the ends. First the aft end then the front bottom cross tie. I will do the box beam cross tie after I turn the assembly over. With those done I could test fit the skin. It fit like a glove. All of the internal pieces have not been fitted yet, I have enough done to drill the skin and turn it over. I haven’t decided on the exact sequence yet. |