Lots done, but still lots to go on the Horizontal Stabilizer.

Picking up from last time, here is a shot with both surfaces pilot drilled and clecoed in place.  The leading edge pulls nicely to the rib. The rib tips are also in place but not trimmed yet.

      These two shots show the piece after all the pilot holes are drilled and then after all the pilot holes are updrilled.  Note the bottom row of silver clecoes. These holes will not be updrilled until attaching the hinges for the elevators.