Mixed in with the electrical system has been non electrical work, such as the vent tubing installation. This is because the work is required for closeout of the next step, installing the fuel system.  Since these items all come together, electrical or not, the non-electrical items have been commingled with the electrical.

The next item up is a case in point. The throttle and mixture controls attach to the panel so they have been worked on side by side with other panel work. I need to have these cables secured and running out of the way from the tank. Starting in the middle of cables, I fashioned a fitting to secure the cables to the side of the fuselage vertical angles. I also clamped them together so that they help support each other.